Maha Housing Recruitments Online Mhada Recruitment 2021 Sep 16, 2021 महाराष्ट्र गृहनिर्माण व क्षेत्र विकास प्राधिकरण, मुंबई,  प्रसिद्ध केलेल्या जाहिराती नुसार  खालील पद भर्ती घेण्यात येणार.  कार्यकारी अभियंता [स्थापत्य ], उप अभियंता [स्थापत्य ], प्रशासकीय अधिकारी , सहायक अभियंता [स्थापत्य ], सहायक विधी सल्लागार, कनिष्ठ अभियंता [स्थापत्य], कनिष्ठ वास्तुशाश्त्रज्ञ सहाय्यक, स्थापत्य अभियांत्रिकी सहायक,   वरिष्ठ लिपिक, कनिष्ठ लिपिक,  लघुटंकलेखक, भूमापक,  अनुरेखक  अशा विविध पदांच्या 565 रिक्त जागांसाठी अर्ज मागविण्यात येत आहेत. इच्छुक आणि पात्र उमेदवारांनी 14 ऑक्टोबर 2021 पर्यंत अर्ज सादर करावे. अधिक माहिती साठी कृपया दिलेली Pdf जाहिरात वाचावी. Maha Housing Recruitment 2021 Mhada Recruitment 2021:  Maharashtra Housing And Area Development Authority, Mumbai invites offline application form for the posts of Executive Engineer [Architecture], Deputy Engineer [Architecture], Administrative Officer, Assistant Engineer [Archite...

Building Construction Materials.


Building Construction Materials -
10/02/2020. 

01. Fibre glass

A.retains heat-longer

B.has a higher strength to weight ratio

C.is shock proof and fire retardent

D.does not decay

E.all the above.

Answer - E

02. The commonly used colour pigment in         paints, is

A.ambers

B.carbon black

C.iron oxide

D.lamp black

E.all the above.

Answer - E

03. For melting one tonne of cast iron

A.700 m3 air is required

B.20 kg limestone is required

C.one quintal coke is required

D.all the above.

Answer - D

04. For filling cracks in masonry structures, the type of bitumen used, is

A.cut-back bitumen

B.bitumen-emulsion

C.blown bitumen

D. Plastic bitumen. 

Answer - D

05. Plastic

A.is an organic substance

B.consists of natural or synthetic binders

C.finished products are rigid and stable at normal temperature

D.is capable of flow when necessary heat and pressure are applied

E.All the above.

Answer - E


06. Vanadium steel is generally used for

A.railway switches and crossing

B.bearing balls

C.magnets

D.axles and springs.

Answer - D

07. Pick up the correct statement from the following:

A.In basic Bessemer process, the steel heats the converter

B.In open-hearth process, the furnace heats the steel

C.In Siemens process, the impurities of pig iron are oxidised by the oxygen of the ore

D.all the above.

Answer - D

08. The process of manufacturing steel by heating short lengths of wrought iron bars mixed with charcoal in fire clay crucibles and collecting the molten iron into moulds, is known as

A. Cementation process

B.Crucible process

C.Bessemer process

D.Open hearth process.

Answer - B


09. Varnish is a transparent or semi-transparent solution of resinuous substances in

A.alcohol

B.linseed

C.turpentine

D.all the above.

Answer - D

10. Initial setting time of cement for asbestos cement products should be not less than

A.30 minutes

B.50 minutes

C.75 minutes

D.90 minutes.

Answer - D